News

New White City building to host entire Computing department

A CGI representation of the building. Imperial College London

All teaching and research activities of the Computing Department are expected to move to the new Principal Academic Building within White City Campus. Other departments will partially relocate, including the departments of Mathematics, Chemistry, and the Imperial Business School. 

 The Principal Academic Building will begin construction in mid-2026 and is due to be completed in 2029, according to consultation materials on Imperial’s website.

The building is designed for multidisciplinary research across a variety of fields. It has been described as “a powerful engine for data science, AI and machine learning by bringing together computer scientists, mathematicians and business experts at an unprecedented scale,” as well as being designed to deliver “world-leading research for the environment, energy engineering, drug discovery, population health and security science.” 

It is planned to overtake City and Guilds as the largest building at Imperial, and its completion will increase total campus teaching space by 17%. It will contain research, study, and communal spaces across 14 floors. 

The public will have access to both the first and ground floors of the new building. The ground floor will contain a café, an exhibition area and a mezzanine. The first floor will also have a café terrace, and an open floorplan learning space. 

From Issue 1900

19 Jun 2026

Discover stories from this section and more in the list of contents

Explore the edition

Read more

Imperial did not carry out an Impact Assessment prior to Prince’s Garden lease

Imperial did not carry out an Impact Assessment prior to Prince’s Garden lease

A Freedom of Information Request from Felix found that Imperial did not carry out an Equality Impact Assessment prior to its decision to lease 14–15 Prince’s Garden to Brighton College Prep Kensington.  The College also refused to disclose the financial terms of the 40-year lease, which is

By Guillaume Felix
Gender gap in Imperial First-class rate achievement increasing again

Gender gap in Imperial First-class rate achievement increasing again

The gender gap in the share of female and male undergraduates who are awarded First-class degrees at Imperial is increasing again, data obtained via a Felix Freedom of Information request shows. A higher share of female graduates was awarded First-class degrees in 2019-20 for the first time,

By Guillaume Felix and William Chia